Cardinal Logo 
Home  |  Media  |  Contact Us  |  Careers
 FB      LI

MEDIA


Gaines County Water Supply LLC

It is an exciting time to be building Water and Water treatment facilities. We are completing our Design/Build Project for Gaines County Water Supply LLC that was previously reported. The project is expected to be online and fully functional before the first of the year. The project provides over 2,200 gpm of treated water for the residents of Gaines County Texas. The well water is treated using an advanced Reverse-Osmosis (RO) method to provide the safest drinking water currently available.


Palm Beach County Florida

We have been awarded a continuing services Design-Build contract with Palm Beach County Florida. This contract allows the Municipality to fast track their procurement and go directly into design and construction for the next three years, for any of the projects on their capital expenditure plan that they have funds for.


Awarded Projects

We have been awarded several projects including: Lee County FL, Fiesta Village Switchgear – This projects involves the managing the demolition, removal, and installation of new electrical switchgear to the Wastewater Treatment plant. This also includes the installation of a new backup power generation system. Lee County FL, Fiesta Village Headworks – This project involves bypassing the Wastewater Treatment plant’s headworks, and refurbishing all the concrete structure, demolition, removal, and installation of new Headworks equipment. Collier County FL, Clarifier Rehabilitation – We are removing an existing, and installing a new 130’ mechanism as well as several chemical feed, mechanical, and electrical modifications. Doe Branch Water reclamation Plant, TX – We are constructing all the concrete structures associated with this facility as a subcontractor to CDM. This includes the influent pump station, aeration basins, clarifiers Dewatering building, and Ultraviolet disinfection system. Andrews TX Water Treatment plant – We are constructing a 7.2 million gallon per day arsenic and fluoride removal water treatment system. This involves process building construction, mechanical piping, and process equipment installation.

bott

Home  |  Media  |  Contact Us |  About Us  |  Markets  |  Services  |  Projects  |  Safety  |  Sustainability  |  Careers

© Copyright 2014 Primoris Services Corporation. All rights reserved.