Cardinal Logo 
Home  |  Media  |  Contact Us  |  Careers
 FB      LI

PROJECTS


WASTEWATER TREATMENT

Wastewater Treatment Facility Improvements, Mulberry, Florida

Demolition of the existing treatment mechanisms and installation of new mechanisms (in SBR #1, #2, #3 and digester). Renovation of existing SBRs to Siemen Jet-Tech SBR process. Modification of existing out-of-service chlorine contact tank to a sludge holding tank. Renovation of existing digester and installation of polymer drum thickener equipment. Installation of Siemens house and PLC system

 

PROJECTS


WATER RECLAMATION

Manatee County - SW Water Reclamation Facility Clarifiers 1&2 Rehab, Bradenton, Florida

Demolition of existing clarifier mechanisms, effluent launders, construction of new mechanisms and concrete effluent launders in Clarifiers 1 & 2. Construction of metal canopy addition to the RAS/WAS pump station. Electrical to Clarifiers 1 & 2 and the existing scum pump station. Addition of new VFD for the existing RAS Pump #2.

 

PROJECTS


WATER TREATMENT - NITRIFICATION

City of Sarasota - Nitrification Basin Improvements, Sarasota, Florida

Nitrification Basin Improvements including the internal recycle pump assembly (IRP), mixed liquor pumps assemblies (MLP), IRP piping header, MLP piping header, bonneted knife gate valves; spare IRP/MLP pump and nitrification basin air piping modifications

 

PROJECTS


WATER TREATMENT

Sarasota County - Pump Station #3 Improvements, Sarasota, Florida

Modifications to an existing pump station including, electrical distribution equipment, pump motors, variable frequency drives, control panel and instrumentation components, installation of a diesel generator and automatic transfer switch, venturi flow meter and a chemical injection system and the demolition of a diesel-driven pump and fuel oil storage tank.

 

PROJECTS


WATER TREATMENT

Port of the Islands Community Improvement District, Florida

Construction of new water treatment plant including site/civil work, coordination with Severn Trent through the engineer, temporary facilities, demolition, restoration, equipment and materials startup and testing, all appurtenances, and all other required contract work, including storm drainage systems, electrical systems, chlorine contact tank, instrumentation and SCADA Systems and yard piping.

 

PROJECTS


WASTEWATER TREATMENT / REVERSE OSMOSIS

City of Clewiston - RO WTP and Raw Water

Construction of raw water transmission systems, a 3.0 MGD capacity low pressure reverse osmosis water treatment plant including a membrane process building, (3) 1.0 MGD RO units, chemical bulk storage and feed systems, permeate degasification and odor control scrubber systems, a 1.5 MG water storage tank, high service pumping system, generator and fuel storage, finished water transmission system improvements.

 

PROJECTS


REVERSE OSMOSIS

City of Sarasota - Reverse Osmosis WRF

Design/Build 6.0 MGD - Hollow Fiber to Spiral Wound 3-Train System

 

PROJECTS


WASTEWATER TREATMENT / REVERSE OSMOSIS

DeSoto County BOCC - DeSoto County RO D/B

Design/Build project for two reverse osmosis water treatment facilities at separate locations in DeSoto County. The work included the construction of pre engineered buildings to house the process equipment, anti scalant, sodium hydroxide, and sodium hypochlorite feed pumps, packed tower degassifiers, yard piping, raw water well pump installation, electrical and controls, disinfection, flushing and start, and certification up of both facilities.

 

PROJECTS


WASTEWATER TREATMENT

City of Miramar - Wastewater Reclamation Facility

Design/Build expansion of the WWRF to a permitted capacity of 10.5 MGD on an AADF. Work includes: (1) new aeration basin, modifications to the existing (4) aeration basins, modifications to the existing blower building, (1) new clarifier, modifications to the existing sludge pumping station, (1) new injection well pump & replacement of the existing

 

PROJECTS


WASTEWATER TREATMENT

Hillsborough County - Valrico AWTP Exp. from 6 to 12 MGD Ultraviolet Disinfection

Construction of (2) new 5.0 MGD pre-stressed concrete Reclaimed Water Storage Tanks, (1) new UV electrical bldg., (2) new electrical bldgs., (4) new deep bed filters, (1) new walkway to filters, (3) new clarifiers, (1) new clarifier influent splitter box, (2) oxidation ditches, (2) cyclone degritters/classifier units, (4) aerators, (1) sodium hypochlorite feed system, (1) alum feed system, (1) reject water storage pond, (1) reject water pump station, (1) lift station, (2) anaerobic selector tanks and mixers, (1) nutrient analyzer system, (2) generators and fuel systems.

 

PROJECTS


WATER & WASTEWATER TREATMENT

Northwest Class A Sludge Processing Facility - Hillsborough County, FL

Construction consisted of a Class A sludge processing facility utilizing rotary drum thermal dryers to dewater and pelletize domestic wastewater sludge, demolition of existing belt filter presses. Work also consisted of the installation of (4) new prepurchased sludge centrifuges, constructing a new biosolids processing building, a new foreign sludge receiving station, and installation a new asphaltic concrete pavement.


Water System Improvements RO WTP and Transmission Systems - City of Clewiston, FL

Construction of raw water transmission systems, a 3.0 MGD capacity low pressure reverse osmosis water treatment plant including a membrane process building, (3) 1.0 MGD RO units, chemical bulk storage and feed systems, permeate degasification and odor control scrubber systems, a 1.5 MG water storage tank, high service pumping system, generator and fuel storage, finished water transmission system improvements.

PROJECTS


WATER & WASTEWATER TREATMENT

Everest WRF Expansion Plant Upgrade - Cape Coral, FL

Installation of aeration basins, clarifiers, return activated sludge, waste activated sludge facilities, filters, chlorine contact tank, deep injection well and surge tank were completed for this project. Construcions also included a reclaimed water pump station, generator building, blower building, sodium hypochlorite & alum storage and dispensing system, administration building, electrical building, yard piping. Modifications to the pretreatment system, aeration basins, aeration blowers, clarifiers, filters, reclaimed storage tanks was also completed.

 

bott

Home  |  Media  |  Contact Us |  About Us  |  Markets  |  Services  |  Projects  |  Safety  |  Sustainability  |  Careers

© Copyright 2014 Primoris Services Corporation. All rights reserved.